| Deutsch English Français Italiano |
|
<0kdbilx65a.ln2@Telcontar.valinor> View for Bookmarking (what is this?) Look up another Usenet article |
Path: news.eternal-september.org!eternal-september.org!feeder3.eternal-september.org!fu-berlin.de!uni-berlin.de!individual.net!not-for-mail
From: "Carlos E.R." <robin_listas@es.invalid>
Newsgroups: sci.electronics.design
Subject: =?UTF-8?Q?Re=3A_Causes_of_the_Gran_Apag=C3=B3n_=28Spain=29=2C_first?=
=?UTF-8?Q?_oficial_report?=
Date: Wed, 18 Jun 2025 20:37:20 +0200
Lines: 35
Message-ID: <0kdbilx65a.ln2@Telcontar.valinor>
References: <6rs8ilxccg.ln2@Telcontar.valinor>
<1re47ks.s13naaq38sy8N%liz@poppyrecords.invalid.invalid>
Mime-Version: 1.0
Content-Type: text/plain; charset=UTF-8; format=flowed
Content-Transfer-Encoding: 7bit
X-Trace: individual.net dKlS/SFQGYD9SwmTcXqCwwZL1ztkNL2AOJIuyD7l9D5z8VfRrV
X-Orig-Path: Telcontar.valinor!not-for-mail
Cancel-Lock: sha1:cIN6i6DY1RhOreNfqkV7ycDosWQ= sha256:1lkYBdOGCTYXirKlgQRzOkxCoNmVK2aTHAmjGz30wws=
User-Agent: Mozilla Thunderbird
Content-Language: es-ES, en-CA
In-Reply-To: <1re47ks.s13naaq38sy8N%liz@poppyrecords.invalid.invalid>
On 2025-06-18 09:39, Liz Tuddenham wrote:
> Carlos E.R. <robin_listas@es.invalid> wrote:
>
> [...]
>> ...the minister for
>> ecological transition, Sara Aagesen
> [...]
>> the
>> "system did not have enough dynamic voltage capacity".
> [...]
>> did not absorb all the voltage
>> they were supposed to when tension was high," she said,
>
> The usual nonsense we have come to expect from 'factual' reports.
> Ignorant minister? Ignorant reporter? ...or both.
The report was written by a committee of experts. Fifty, I think.
The committee studying the blackout is made up of representatives of the Ministry for Ecological Transition and the
Demographic Challenge (MITECO), the Presidency of the Government, the Ministry of Defence and the Ministry of the
Interior. Specifically, the Department of Homeland Security, the National Intelligence Centre, the General Staff and the
National Centre for the Protection of Critical Infrastructure are involved.
https://www.miteco.gob.es/es/prensa/ultimas-noticias/2025/abril/el-gobierno-crea-el-comite-para-el-analisis-de-la-crisis-de-elec.html
#:~:text=Adem%C3%A1s%20del%20MITECO%2C%20el%20Comit%C3%A9%20est%C3%A1%20integrado,medio%20del%20Centro%20Nacional%20de%20Protecci%C3
%B3n%20de [www.miteco.gob.es]
The blackout, which occurred on 28 April 2025, affected the Iberian Peninsula, including Spain, Portugal and Andorra, and
extended as far south as France. The power outage caused disruptions to essential services such as hospitals, airports and
telecommunications networks. The causes of the blackout are being investigated by this committee.
--
Cheers, Carlos.